If it passes
Take the next step — every action here is one tap away.
Harris County approved engineering services to assess drainage systems in Precinct 1, helping protect our neighborhoods from flooding damage.
Type: Contract - AmendmentFile: 26-2914 Status: Passed Legislative Body: Commissioners Court Introduced: 2026-04-30 Passed: 2026-05-14
Luis.Cabrera@harriscountytx.gov
This and 7 more nearby in Our Voice — tap a dot to open it.
Houston floods a lot. This study finds weak spots in drains and pipes in Precinct 1 so fixes can happen before the next big storm damages homes, schools, and businesses.
Two outcomes
If it passes
If it doesn't
Both outcomes shown neutrally. We don't take a side — we make sure you can see what's at stake.
Engineers study Precinct 1 drains, find problem spots, and recommend fixes — helping future projects stop flood damage to homes and businesses before storms hit.
No new drainage study happens, weak spots in Precinct 1's flood system stay unknown, and flood risk for families in the area remains unchanged.
Counted from the Community Exchange connection graph.
Every page is a door. Pick one and keep going.